Please accept this formal submission on the Draft North Coast Growth Corridor Community Facilities Plan (CFP) on behalf of Jump, Skate, Pump.
As a resident of the North Ward and an active stakeholder in our local sports landscape, this submission advocates for the immediate prioritisation and inclusion of a regional-scale action sports precinct — incorporating the Proposed Alkimos MTB Trail Hub, a UCI-standard BMX raceway and asphalt Pump Track, Freestyle BMX jumps, and an all-wheels skate plaza — within the immediate 5-year planning framework.
Having reviewed the final Otium Planning Group report, the following addresses several critical gaps where the JSP framework directly solves the exact strategic and demographic challenges the City has identified.
87 community responses. 4 days. Zero paid promotion.
The demand data behind this submission is fully documented.
Youth Activation Crisis: The Growth Window Is Now
The Otium report confirms the North Coast corridor is entering its highest population migration surge right now — between 2026 and 2031. Yet Table E1 defers key youth active infrastructure — including the Yanchep BMX facility and the Eglinton/Alkimos skate parks — until 2034 and 2037.
Deferring these facilities for 8 to 11 years is a generational failure. WA's fastest-growing corridor will reach peak adolescent population without a single high-progression active space within reach. The participation rates, mental health outcomes, and community cohesion costs of that gap will be borne by the State long after the deferral decision is forgotten.
High-Density Urban Shift Demands a State Response
The report explicitly acknowledges: "there is likely to be a more intense and higher density development along the coastal corridor than that which was previously envisaged." Higher-density living means smaller lots, townhouses, and minimal private outdoor space.
The State's fastest-growing community cannot be left without shared active infrastructure to replace what density removes. The Jump, Skate, Pump framework directly addresses this structural shift — delivering a high-yield, high-occupancy regional hub that activates daily and serves every age group across the corridor.
International Event Legacy Unlocks State & Federal Grants
The report rightly mandates that "grant assistance should be sought to help offset the City's contribution" toward the projected $770.8 million corridor infrastructure cost.
A formal Letter of Intent from Velosolutions confirms Perth as the designated host city for the 2028 UCI Pump Track World Championships — contingent on delivery of a UCI-standard facility. This is not a bid. The event is confirmed. The facility is the only remaining condition. That confirmation elevates this project from a municipal line item to a State-significant international event legacy asset — providing the exact strategic leverage required to unlock substantial State and Federal sporting infrastructure grants and offset municipal capital expenditure.
Expert-Led Governance via Action Sports Advisory Committee
Action sports infrastructure requires highly specialised technical design expertise. Without it, facilities are routinely under-designed, under-utilised, and costly to retrofit — a pattern seen repeatedly in standard concrete skate parks across WA.
To ensure this precinct is delivered to international competition standard, a formal Action Sports Precinct Advisory Committee will be established — as requested by Rohan Klemm at the Proposed Alkimos MTB Trail Stakeholder Meeting on 17 June 2026. This governance structure protects the City's investment and ensures the facility meets both UCI requirements and long-term community needs.
Empirical Proof of Local Demand
To prove that the community is actively demanding this infrastructure ahead of the detailed concept plan release, the Jump, Skate, Pump: North Coast community platform was launched on 19 April 2026. The empirical engagement data captured over three months is undeniable:
The community is speaking clearly, the global partners are ready, and the layout is fully envisioned.
We look forward to collaborating with the City's Leisure Planning team over the coming months as we finalise our vision in an initial concept presentation to the City of Wanneroo.